Open-weight models
How fast are open-weight models catching up?
Once a capability appears in a downloadable model, it cannot be withdrawn. The gap is one measure of lead time.
Published gap ranges (months behind frontier)
Bars show the published range. Labels are as reported; we do not place undated estimates on a time axis.
Gap estimates
General · Dec 2025 report
4 to 8 months
Caveat: Based on external benchmarks. The future trajectory is uncertain.
Cyber · Most of 2025
6 to 10 months
Caveat: Reported retrospectively in the Jul 2026 post. Range results are weaker evidence than narrow tasks.
Cyber · Jul 2026
4 to 7 months
Caveat: Range results are weaker evidence than narrow tasks. Gap narrowed from 6 to 10 months.
Model pairs
No model pairs published yet. Pairs are added only when a primary source names both models and the lag. We do not estimate missing values.